(1) The head of the team may hire the workers as per schedule-1 for mineral survey work with the approval of the Director General, not exceeding the number specified in schedule-2.
However, three thousand The number of salaried workers required during mineral survey work at places higher than meters or in remote hilly areas where workers are generally not available will be as determined by the Director General. Related work will have to be done.
But in the case of porters who carry heavy loads, the head of the heavy lifting team will make arrangements for each porter not to be less than thirty kilograms. A miner (minor) should dig at least 0.5 cubic meters per day and a sample cutter should cut at least half a meter of rock with a depth of at least five centimeters and a width of ten centimeters per day.